#19: Aim Small – Miss Small

By No comments yet

Then he asked the kids: What did I tell you about shooting? Aim small – miss small, they replied. It was years before I made the connection between aim small – miss small and PM/CM and project controls. I learned this catchy saying watching the movie, The Patriot. In the movie, Mel Gibson’s character is raising a bunch of kids …

#9: 7 CPM Tips: Supers/PM’s/CM’s This One’s For You

By No comments yet

CPM tip #1: Hire a scheduler with Construction Management experience The ideal career path for a scheduler is: Superintendent->Project Manager-> Construction Scheduler. It is the career path less traveled; but if you can find even one such scheduler, you will have really found something. A scheduler without construction experience can’t build a schedule without the help from a CM type. …

#4: Too Green – Too Few

By 4 comments

I have seen a lot written recently about project failures and there seems to be a few popular opinions circulating that are polar opposite to what I have learned over the last 22 years in the trenches. I am often called in to build recovery schedules. I have seen my fair share of project failures – or at least projects …